Student Facilities and Hostel Upgrades Enhance Campus Life in Russia
In the dormitory No5, 6, showers are being repaired. As reported by the Vice-Rector for Administrative and Economic Work Maxim Dmitrievich Tsoi at meetings with students, it is taking place in stages. The women's showers have already been completely transformed, now work is underway in the men's shower room. During the repair work, students take a shower according to the schedule.
It is also planned to repair the entrance group in the dormitory over the summer - the door and vestibule.
In the morphological building, due to the construction of a partition in the hall of the first floor, a new study room appeared. And the workshop No4 was transformed after the walls were repaired.
In dormitory No2, showers are also being repaired.
In the Cardiac Surgery Clinic, four bathrooms have been renovated - for patients and staff.
From July 1, repair work is planned on the façade of the main building.
![]() ![]() ![]() ![]() | ![]() ![]() ![]() ![]() |







